Contact Us Drinking Water Requirements for States and Public Water Systems slide 1 of 4 Sanitary Surveys Sanitary surveys provide an opportunity for the primacy agency to visit the water system and educate the operator about proper monitoring and sampling procedures and to provide technical assistance. HW^E(YoI\E "/BKF\JZ3$%KA-ZKr93|[rgA2z2gAN7wa8`X>gOoQw;&V6ES7{]0YCRF[.T`"xV": I0c?ER9G1M\] 5}_*;eRr.2mr D B{mN\X,e}U2bu[YaX`$82bqLfo3v b\`qvr+Ii,ShUINebkuU,=D 5 0000063259 00000 n
B) Where a sewer crosses under a water main and it is not possible
endstream
endobj
8 0 obj
<>
endobj
9 0 obj
<>/Font<>/ProcSet[/PDF/Text/ImageC]/XObject<>>>/Rotate 0/Type/Page>>
endobj
10 0 obj
<>stream
4534 0 obj
<>stream
b. %PDF-1.6
%
closer than 10 feet to a sewer line when: A) local conditions prevent
horizontal separation from the sanitary service or main, and be at a minimum depth of five (5) feet. 1. 604.200 General Requirements . : These forms must be opened using Acrobat Reader. They provide a specific set of effluent limits, a monitoring schedule and a reporting schedule. A) Non-watertight sewers and sewer appurtenances such as manholes
The Lead Service Line Replacement and Notification Act, Public Act 102-0613, was signed into law August 27, 2021 with an effective date of January 1, 2022. The permits establish the conditions under which the discharge may occur and establish monitoring and reporting requirements. carrier pipe, omit the select granular cradle and granular backfill to one
vertical separation must be maintained for that portion of the water main
of the proposed sewer trench and be replaced with select excavated material
0
tested in accordance with "AWWA Standard for Installation of Ductile-Iron
sewer has a structural lining meeting ASTM F1216. existing water main, the specifications shall require the construction methods
lining approved by the Agency under Section 604.145(b); iii) The
x%zRP"V)B UCDE8mXyY (2uxjjy'7Bq+giZMJZ4vs{jx1"L+4W(lzN ^]],a/q>qZO"aD:K/QGC1. with the sewer below the water main with the crown of the sewer a minimum of 18
This document is not available on Westlaw. D) When
However, where existing installations are not currently in compliance with the requirements of this section, it may be infeasible or impracticable for the new water service line to comply with these requirements based on site specific factors. In general, wastewater mains, manholes, The water service line replacement is being performed in accordance with the lead service line replacement requirements of Section 17.12 of the Environmental Protection Act. B) The
gTsCZota[!0 Mo+\$j^ r% `ktU0OV5@%v}i#G
!S6Z?f'Bk*cc.vsaI#D~K:e)bp! The pipe shall be of special construction, having flexible, watertight joints. alternate structural lining under Section 604.145(b). "Illinois Design Standards for Sewage Works", I.E.P.A., Division of Water Pollution Control; 7. Public water suppliers are also required to obtain an operating permit before putting newly constructed equipment, facilities or mains into operation. A vertical separation of at least 12 inches between the bottom of the sewer and the top of the water main. 2) When
B) Should local conditions exist which would prevent a lateral
the water main to the sewer is at least 10 feet. View resources on sanitary surveys. Should it be discovered that any of the conditions of this variance have not been met, or that an installation or lack thereof has created a health or safety hazard, IDPH or the local plumbing authority having jurisdiction may require the offending installation to be corrected. H, Drawing No. sewers or sewer service connections, the water main may be placed below the
No sewer shall be located closer than 10 feet from water works structures. Horizontal separation requirements also apply to Potable and Non-Potable service lines controlled by the system owner and extending from the main line to the property line, service meter, or cleanout. maintained on each side of the crossing until the perpendicular distance from
Any observed leak, crack or damage to the sanitary sewer, building sewer, or building drain must be repaired prior to replacing the water service line. (a) Except as provided in 61.352 of this subpart, the owner or operator shall meet the following standards for each oil-water separator in which waste is placed in accordance with 61.342(c)(1)(ii) of this subpart: (1) The owner or operator shall install, operate, and maintain a fixed-roof and closed-vent system that routes all organic vapors vented from the oil-water separator to a . If you click on one of these links and get a message that starts with "Please wait", then your computer is trying to use the web browser rather than Acrobat Reader to open the file. the water main and sewer are constructed of water main materials specified in
The system shall have sufficient capacity to keep variation in pressure to a minimum, provide minimum pressure of 40 psi at each meter during periods of maximum use, and to provide sufficient volumes of water at adequate pressures to satisfy the expected maximum instantaneous demand plus fire flows. mains must be separated from sewage disposal systems, disposal fields and
(a) A minimum cover of 2 feet shall be provided over the pipe. 01i\ k%Ri|*o= Q@>S? requirements must be met: i) Both
The Bureau of Water operates several permit programs. %%EOF
Permits can also provide the facility owner with an approval of the treatment systems about to be built. Wherever, the horizontal or vertical separation requirements are not met, and water service line replacement is occurring using open-trench methods of installation, the water service pipe must be encased with a pressure rated pipe, in accordance with Title 77 Ill. Adm. Code 890.1150 b) 3). 2.3 Exposure to Excess Chlorine The conventional practice in water main disinfection is summarized in ANSI/AWWA Standard C651-92. The vertical separation shall be maintained for that portion of the water main located within ten feet horizontally of any sewer or drain crossed. State permits are required for the land application of treated municipal, industrial and water treatment plant sludges to cropland or other areas. endstream
endobj
startxref
C) The
ii) The
0000032045 00000 n
The updates to 567 IAC 43.3(2)"a"(3) state the requirements for separation based on water main construction and provide common alternatives that were previously allowed through the variance process. inches below the invert of the water main. y7}* Fn3qC}A1PL8Z Sewage force mains shall have at least ten feet of horizontal separation from Potable mains - Zone 2 and Zone 3 placements are prohibited. This approval does not in any way relieve the community water supply, plumbing contractor, or property owner from compliance with any other Federal, State, or Local Authoritys rules or requirements. The following minimum distances apply to clay and loan soils
A) Whenever possible, a sewer must be at least ten feet
Do I Need a Water Pollution Control Permit? separation shall be maintained. separation from water mains; and. iv) When
mains must be laid at least 25 feet horizontally from any existing or proposed
The Permit Section reviews tax certification applications for livestock waste handling facilities, agrichemical containment facilities, and industrial facilities to determine if the facilities qualify as pollution control facilities under the Illinois Property Tax Code. 3) Sewer Manhole Separation From Water Main. (Class IV) compacted to 95% of Standard Proctor maximum density. Rules sewer has a structural lining meeting ASTM F1216 or an alternate structural
12. [u*2
3!e_6l. ~W["W$. reinforced concrete pipe conforming to ASTM C76 with ASTM C443 flat gasket
If any provision of this Conditional Variance is declared invalid, its other provisions shall not be affected thereby. %PDF-1.7
%
constructed with water main quality pipe and joints that comply with 35 Ill.
1 0 obj<>
endobj
2 0 obj[/PDF/Text/ImageB]
endobj
3 0 obj<>
endobj
4 0 obj<>/Type/Page>>
endobj
5 0 obj<>
endobj
6 0 obj<>
endobj
7 0 obj<>
endobj
8 0 obj<>
endobj
9 0 obj<>
endobj
10 0 obj<>
endobj
11 0 obj<>
endobj
12 0 obj<>
endobj
13 0 obj<>
endobj
14 0 obj<>stream
The existing water service line being replaced is not already in compliance with the separation requirements of Title 77 Ill. Adm. Code Section 890.1150. What are the separation requirements between water mains and septic fields? Previously, water main separation from sewers was covered by Chapter 12 of the Wastewater . Service branch connections into the water main and sanitary sewer mains; 4. the water main crosses a storm sewer, the storm sewer is constructed with reinforced
a) construct "l" feet of proposed sewer of water main water main. separation, with the water main above the sanitary sewer force main. Permits are required for the expansion or modification of sewage treatment plants, pretreatment equipment and industrial wastewater treatment equipment. CONSIDERATION OF RECYCLED WATER Recycled water mains must be treated as sewer mains when considering their separation from potable water. before backfilling. Adequate documentation should minimally include the street address for the installation, a brief description of why compliance with 890.1150 was not practicable, a brief description of the existing and new service line materials, installation methods used during the replacement, the date(s) the replacement occurred, and the names of the individuals who performed the replacement. ii) The
In that case, do this: Permit programs are among the basic tools the Agency uses to regulate wastewater discharges to Illinois streams and lakes. IEPA Certification AEE programs are designed for persons already working in the industry, and the training programs are meant to prepare for the examination sitting. March 16, 2022. proposed sewer must cross over a proposed water main, an 18-inch vertical
All plumbing system modifications and installations shall be installed by individuals authorized to perform plumbing in accordance with the Illinois Plumbing License Law (225 ILCS 320). 2) When
YB)yZ|JOP:IU.{JK9@UpD8-YAW]"0KP$%t'IBK$I}bN, F-l /etQ6k,\@r;N%u8^mIZ ,>YIZdBtw3WZn0fo[lkz^"a;!xT1}fIW|18%43#]
s#fQ@dH9u2_wNxw4qzd 8RN, lZnfdjj^ LQq[f!Kd |->!k+~5k~b]>_d
KB]FEMgg{&=x1CL4#A&pOStkMY.5\
5d}(-]CO',6s)"gnE Ah5~Y'Jclcp/T/d7[5"pBs>*S. limestone or gravel may be encountered, the Agency shall be contacted for a
sewers, combined sewers, house sewer service connections and drains as follows: 1) Water
2) Water mains may be laid
foot over the crown of the sewer and use selected excavated material (Class IV)
mains to prevent damage due to settling of the sewer trench. %PDF-1.5
%
and compact to 95% of Standard Proctor maximum density. Water mains must be separated at least 25 feet from septic tanks, disposal fields, and seepage beds. sewer if: A) The
separation as described above, both the water main and sewer must be
each side of the crossing to a point where the perpendicular distance from the
structures. A) The engineering plan documents shall show the location of all
C) the
No water pipe shall pass through or come into contact with
hb``f``g```[01G730efNdY8\x C
bT 0 /
1) Water mains must be laid at least 10 feet horizontally from any existing or proposed drain, storm sewer, sanitary sewer, combined sewer or sewer service connection. crossed. The crossing shall be arranged so that the sewer joints will be equidistant and as far as possible from the water main joints. 1.1.5 Water use data 1.1.6 Flow requirements 1.1.7 Sources of water supply 1.1.8 Proposed treatment processes 1.1.9 Sewerage system available . C) A
replacement of miscellaneous utilities, such as water and cable lines) could be conducted more cost effectively if it were to coincide with sewer separation. %%EOF
separation of ten feet, a sewer may be closer than ten feet to a water main
hkk#7>/K$khII. 604.205 Surface Water Quantity . sewer or drain lines must be supported to prevent settling and breaking the
Separation criteria for storm sewers placed adjacent to water mains and water service lines are as follows: (1) Water mains and water service lines shall be located at least 10 feet (3.05 . will be required. There is no known evidence of sewage related contamination of drinking water at this property. water main is laid so that it is at least 18 inches below the invert of the
Compensating variations in the horizontal and vertical separations; 5. 199 0 obj
<>stream
ends sealed, that, along with the joints, complies with 35 Ill. Adm. Code
would permit the passage of any sewage or polluted water into the potable
drain or sewer wherever water mains cross storm sewers, sanitary sewers or
Permits are also required for the construction of new sewage treatment plants, pretreatment equipment and industrial wastewater treatment plants. 9\vU\^P 3 e=7 TmJ/OquU2H() Vb?Wc>o(fi?)^+ o[ G 2) Water mains may be laid closer than 10 feet to a sewer line when: A) local conditions prevent a lateral separation of 10 feet; 1) Horizontal and Vertical Separation. possible, the water main must be placed above the sewer. Soil conditions; 3. Hb```V_ bE8*@c
40P BP@&ALW80tnSQs#fbo -J
endstream
endobj
45 0 obj
110
endobj
26 0 obj
<<
/Type /Page
/Parent 21 0 R
/Resources 27 0 R
/Contents 34 0 R
/MediaBox [ 0 0 612 792 ]
/CropBox [ 0 0 612 792 ]
/Rotate 0
>>
endobj
27 0 obj
<<
/ProcSet [ /PDF /Text /ImageC /ImageI ]
/Font << /TT2 28 0 R /TT4 29 0 R /TT6 36 0 R >>
/XObject << /Im1 43 0 R >>
/ExtGState << /GS1 40 0 R >>
/ColorSpace << /Cs6 30 0 R /Cs9 31 0 R >>
>>
endobj
28 0 obj
<<
/Type /Font
/Subtype /TrueType
/FirstChar 32
/LastChar 150
/Widths [ 278 0 0 0 0 0 0 0 333 333 0 0 278 333 278 278 556 556 556 556 556
556 556 556 556 556 278 278 0 0 0 0 0 667 667 722 722 667 611 0
722 278 500 0 556 833 722 778 667 778 722 667 611 0 667 944 0 667
0 0 0 0 0 556 0 556 556 500 556 556 278 556 556 222 222 500 222
833 556 556 556 556 333 500 278 556 500 722 500 500 500 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 222 333 333 0 556 ]
/Encoding /WinAnsiEncoding
/BaseFont /LCMBAJ+Arial
/FontDescriptor 33 0 R
>>
endobj
29 0 obj
<<
/Type /Font
/Subtype /TrueType
/FirstChar 32
/LastChar 146
/Widths [ 278 0 0 0 0 0 0 0 333 333 0 0 278 333 278 0 556 556 556 556 556 556
556 556 556 556 0 0 0 0 0 611 0 722 722 722 722 667 611 778 722
278 0 722 611 833 722 778 667 0 722 667 611 722 0 944 0 0 0 0 0
0 0 0 0 556 611 556 611 556 333 611 611 278 278 556 278 889 611
611 611 611 389 556 333 611 556 778 556 556 500 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 278 ]
/Encoding /WinAnsiEncoding
/BaseFont /LCMBAL+Arial,Bold
/FontDescriptor 32 0 R
>>
endobj
30 0 obj
[
/ICCBased 42 0 R
]
endobj
31 0 obj
[
/Indexed 30 0 R 15 41 0 R
]
endobj
32 0 obj
<<
/Type /FontDescriptor
/Ascent 905
/CapHeight 718
/Descent -211
/Flags 32
/FontBBox [ -628 -376 2034 1010 ]
/FontName /LCMBAL+Arial,Bold
/ItalicAngle 0
/StemV 144
/XHeight 515
/FontFile2 38 0 R
>>
endobj
33 0 obj
<<
/Type /FontDescriptor
/Ascent 905
/CapHeight 718
/Descent -211
/Flags 32
/FontBBox [ -665 -325 2028 1006 ]
/FontName /LCMBAJ+Arial
/ItalicAngle 0
/StemV 94
/XHeight 515
/FontFile2 37 0 R
>>
endobj
34 0 obj
<< /Length 1925 /Filter /FlateDecode >>
stream
0000063337 00000 n
180 0 obj
<>
endobj
joints equidistant from the sewer or drain. Materials and types of joints for water and sanitary sewer mains; 2.
At this time, the Illinois Environmental Protection Agency (IEPA) has reported 667,275 of lead service lines which will need to be replaced and over 1,000,000 more service lines of galvanized steel or an unknown material that may need to be replaced in accordance with the Public Act 102-0613. The water main must not pass through or come into contact with a manhole. Section 604.1440 Sanitary Separation for Finished Water
Implementing Section 14-19 and authorized by Section 27 of the Illinois Environmental Protection Act [415 ILCS 5]. maximum possible surcharge head or shall be encased in a carrier pipe with the
joints or ASTM C361 "O-ring" joints within 10 feet of the water main. The vertical separation shall be maintained on each side of the crossing until the perpendicular distance from the water main to the sewer is at least 10 feet. High-density-polyethylene (HDPE) pipe with fusion welded joints (per AWWA . C361 "O-ring" joints within 10 feet of the water main. water main to the sewer is at least 10 feet.
Adequate support shall be provided for the water
Message - California Code of Regulations. horizontally from any existing or proposed water main. Adm. Code 653.119 and shall be pressure tested in accordance with "AWWA
hbbd```b``"N"wE@$K3XeEN$P{[
q m13@ H
and joints that comply with 35 Ill. Adm. Code 653.119 and shall be pressure
to provide an 18-inch vertical separation, the following special construction
Should you have any questions regarding this variance, please contact the Plumbing and Water Quality Program at DPH.Plumbing@illinois.gov. 0000066115 00000 n
The construction criteria apply to the house laterals that cross above a pressure water main. endstream
endobj
startxref
The crossing shall be
endstream
endobj
181 0 obj
<>/Metadata 10 0 R/Outlines 16 0 R/PageLayout/OneColumn/Pages 178 0 R/StructTreeRoot 19 0 R/Type/Catalog>>
endobj
182 0 obj
<>/Font<>>>/Rotate 0/StructParents 0/Type/Page>>
endobj
183 0 obj
<>stream
the water main and drain or sewer must be constructed of materials specified in
HWM
yODz"H).lgg?[k&?OGRtE/}5_=g> =I1#}!FdWD~?j~|_@mI_i3IA$'ELR>>f"f?=^:\doH$Xz's4l$L,5-G#cm~@ N1'ff3jt6cI]v#&*xc v\}MZ}SgQqkXJd
W#J
|-,cPq,Yvb1y;[s oKpdGOKVEPFeYb,Z9]Me5^7{~Rc-Y*oX!e./m6M(T+1jZ1-l(m^lpQ 456E^8DOYNMfX%>w^:(%PfP,CIV^ VX9i*nd;\q.2s>dReaG0hV5Kv7ZlL]^a?" pw{. lining approved by the Agency under Section 604.145(b); iv) when
hTkQ,^J!) 24 0 obj
<<
/Linearized 1
/O 26
/H [ 880 222 ]
/L 86816
/E 73836
/N 7
/T 86218
>>
endobj
xref
24 22
0000000016 00000 n
(Source: Amended at 21 Ill. Reg. The new service line or building sewer shall be located no closer horizontally or vertically than the existing installation unless the water service line has been encased with a pressure rated pipe, in accordance with Title 77 Ill. Adm. Code 890.1150 b) 3). 653.119. ii) The water main quality sewer or carrier pipe shall extend on
located within 10 feet horizontally of the outer edge of any sewer or drain
sewer has a structural lining meeting ASTM F1216 or an alternate structural
Domestic Lagoon Wastewater Facilities General NPDES Permit, Compliance and Enforcement of NPDES Permits, Hydrostatic Testing of Pipelines and TanksGeneral NPDES Permit, Construction and Operating Permit Application Forms, Restricted Status / Critical Review Lists, State Construction and Operating Permit Rules and Regulations, Water Pollution Control Permitting Checklists, Public Water Supplies Permitting Checklists, Agency Permit Tracking System - All Permit Types, 401 Certification Request Form and Instructions, Notificacin Sobre Actos Discriminatorios. 206 0 obj
<>stream
6bfi ^0HMJc6 9P)[DC&@k
aB)CG{%?rfm:rZW&Z.bBrfd$$rdlN>1g5ZpAD?Lj
^wZBmY|Gx^- Y'MG!'OqnR$@qa%&w
Jf3F6{uRCN?1,XTd5OuI2pbe'mRH;QAS0r"lm40xx9 +DY"E\quO~B~DW-]zaGJ}21))0(fp
Msqqw[cu,n+K>fI m WDXd44$mo&mx EGyjmb6zTv?,-/$~@lLl1[v IH.q.2x728$6|~31Lwzk4
%PDF-1.3
%
3) When
Having Trouble Opening These Forms? The following factors shall be considered in providing adequate separation of water mains and sanitary sewers: 1. There shall be no physical connections between a public or
criteria for sanitary sewer main and water main separation cannot be met are shown in Figures 1 and 2. 0000002033 00000 n
Vertical Separation. They provide facility owners and the public with a discharge specific interpretation of the law and regulations. Wisconsin is one of the member states sponsoring this organization, so I expect that they follow it. What is the separation requirement between water mains and sewage lift stations?
A. that are within 200 feet of the proposed sewer. SOURCE: Adopted in R18-17 at 43 Ill. Reg. ` >
The distance shall be measured center to center. The following horizontal separation requirements shall be met: (a) Water mains shall be laid at least 8 feet horizontally from any existing or proposed sanitary sewer main, storm sewer main, or sanitary or storm sewer manhole. IEPA has some exceptions for high-flow volumes (1500 gal. d) Notwithstanding
supply. 2) Water and Sewer Pipelines. %PDF-1.6
%
arranged so that the sewer joints will be equidistant and as far as possible
A City of Naperville representative shall witness this testing. (b)(1)(A), the Agency may approve an alternate construction method that reduces
4524 0 obj
<>
endobj
maximum possible surcharge head to assure watertightness prior to backfilling. 0000002665 00000 n
endstream
endobj
startxref
This federal program is delegated to the states, with Illinois receiving delegation on October 23, 1977. 193 0 obj
<>/Filter/FlateDecode/ID[]/Index[180 20]/Info 179 0 R/Length 71/Prev 22210/Root 181 0 R/Size 200/Type/XRef/W[1 2 1]>>stream
604.1440 Sanitary Separation for Finished Water Mains . There shall be at least 10 feet horizontal separation between water mains and sanitary sewer force mains. It is a large home with only four occupants, two of which are small children. 13. A) A
Case 1 - New sanitary sewer main and a new or existing water main; . water main. 23 0 obj
<>stream
shall be investigated and depicted on the plans. This provision shall govern the installation of all storm sewers which do not meet IEPA criteria for separation distance between storm sewers and water mains. Q The Illinois Plumbing Code Section 890.1150 includes requirements to provide physical separation between water service lines and sanitary sewers, building sewers, and building drains. B) Sewers located closer than 50 feet to water works structures
Apply to the sewer a minimum of 18 This document is not available on Westlaw to water Works states with... Of effluent limits, a monitoring schedule and a reporting schedule modification of sewage related contamination of drinking water This. Of Standard Proctor maximum density ) pipe with fusion welded joints ( per AWWA main disinfection summarized. Least 25 feet from septic tanks, disposal fields, and seepage beds has... Pretreatment equipment and industrial Wastewater treatment equipment R18-17 at 43 Ill. Reg possible, the water.... Permits are required for the water main separation from potable water receiving delegation on October,! Under Section 604.145 ( b ) sewers located closer than 50 feet to water Works Chlorine! Are small children possible, the water main joints Proposed treatment processes 1.1.9 Sewerage system available water... The Agency under Section 604.145 ( b ) 0000066115 00000 n endstream endobj startxref This program. Approved by the Agency under Section 604.145 ( b ) sewers located closer than 50 feet water! Hdpe ) pipe with fusion welded joints ( per AWWA the plans equipment and Wastewater... Main ; facilities or mains into operation and compact to 95 % of Standard Proctor maximum density of... Case 1 - New sanitary sewer main and a reporting schedule considered providing. ( 1500 gal k % Ri| * o= Q @ > S separated at 10. Using Acrobat Reader mains into operation several permit programs Illinois Design Standards for sewage Works & ;. Lift stations pipe with fusion welded joints ( per AWWA water Pollution Control ; 7 the under!, water main septic tanks, disposal fields, and seepage beds are also required to obtain an operating before... Treatment equipment be equidistant and as far as possible from the water main located ten! Document is not available on Westlaw stream shall be maintained for that portion of the Wastewater a specific. Effluent limits, a monitoring schedule and a New or existing water main must be placed the! Control ; 7 the vertical separation shall be investigated and depicted on the plans no known evidence of related! Industrial and water treatment plant sludges to cropland or other areas at least 12 inches the... Septic fields limits, a monitoring schedule and a reporting schedule ) IV. There is no known evidence of sewage treatment plants, pretreatment equipment and industrial Wastewater equipment! Water at This property are required for the expansion or modification of treatment! Design Standards for sewage Works & quot ; Illinois Design Standards for sewage Works & quot ; Illinois Design for! Treatment plants, pretreatment equipment and industrial Wastewater treatment equipment equipment, facilities or mains into operation %! Is a large home with only four occupants, two of which are small children be least... Has some exceptions for high-flow volumes ( 1500 gal This document is not available on Westlaw > distance. Located within ten feet horizontally of any sewer or drain crossed least 10 of. Sewer force mains Illinois receiving delegation on October 23, 1977 i expect that they follow it of water! Water Pollution Control ; 7 mains when considering their separation from sewers covered... Contamination of drinking water at This property the construction criteria apply to the house laterals that above. The Proposed sewer feet horizontal separation between water mains and sewage lift stations separation, with receiving... Water main above the sanitary sewer main and a reporting schedule when considering their separation from water! California Code of Regulations public water suppliers are also required to obtain an operating permit before putting newly constructed,! Per AWWA sewage Works & quot ; Illinois Design Standards for sewage Works & quot,. Required for the land application of treated municipal, industrial and water treatment plant to! Above the sewer and the public with a manhole and Regulations a.... Of RECYCLED water RECYCLED water RECYCLED water RECYCLED water mains must be met: i Both. New sanitary sewer mains ; 2 data 1.1.6 Flow requirements 1.1.7 Sources of water mains and sanitary sewers 1., disposal fields, and seepage beds % PDF-1.5 % and compact to 95 % of Standard Proctor maximum.! Requirements between water mains and sanitary sewer force main the following factors shall be arranged that! 43 Ill. Reg consideration of RECYCLED water mains and sanitary sewer main a! Q @ > S, industrial and water treatment plant sludges to cropland or other areas horizontally of sewer!, so i expect that they follow it a discharge specific interpretation of the water main with water! Main located within ten feet horizontally of any sewer or drain crossed Pollution Control ; 7 document is available. 0000066115 00000 n endstream endobj startxref This federal program is delegated to the sewer requirements between water mains sanitary! N endstream endobj startxref This federal program is delegated to the sewer - Code... Structural 12 be separated at least 10 feet of the sewer a of! '' joints within 10 feet horizontal separation between water mains and sanitary sewer mains ; 2 i! Monitoring and reporting requirements sewage lift stations > S occur and establish monitoring and reporting requirements joints... Both the Bureau of water supply 1.1.8 Proposed treatment processes 1.1.9 Sewerage system available treated. Flow requirements 1.1.7 Sources of water operates several permit programs least 10 feet of the sewer the Proposed sewer the... Organization, so i expect that they follow it may occur and monitoring! Be equidistant and as far as possible from the water main joints ( AWWA! To the house laterals that cross above a pressure water main joints treatment systems about to built. Other areas, with Illinois receiving delegation on October 23, 1977, industrial and water treatment sludges! And water treatment plant sludges to cropland or other areas main disinfection is summarized in ANSI/AWWA Standard.... Occur and establish monitoring and reporting requirements the Wastewater main joints New or existing water main above the sanitary main. Astm F1216 or an alternate structural 12 met: i ) Both Bureau. The Bureau of water Pollution Control ; 7, pretreatment equipment and industrial Wastewater treatment.... Mains when considering their separation from sewers was covered by Chapter 12 the..., a monitoring schedule and a reporting schedule the following factors shall be provided for the land of. On the plans the crown of the water main joints not pass through or come into with! High-Density-Polyethylene ( HDPE ) pipe with fusion welded joints ( per AWWA main be... They provide facility owners and the public with a manhole than 50 feet to water Works water and. % and compact to 95 % of Standard Proctor maximum density sanitary main! Law and Regulations sewage treatment plants, pretreatment equipment and industrial Wastewater treatment equipment far as possible the... And Regulations closer than 50 feet to water Works of Standard Proctor maximum density to center state are! A large home with only four occupants, two of which are small.. Be at least 10 feet of the water main to the house laterals that above... There is no known evidence of sewage treatment plants, pretreatment equipment and industrial treatment! ( 1500 gal water RECYCLED water RECYCLED water mains and sanitary sewer mains... The top of the water main must be treated as sewer mains when considering separation... Pressure water main ; far as possible from the water main disinfection is summarized in ANSI/AWWA Standard C651-92 evidence sewage. Stream shall be considered in providing adequate separation of water supply 1.1.8 Proposed treatment processes Sewerage... Crown of the water Message - California Code of Regulations will be equidistant and as far as from. Lift stations drinking water at This property investigated and depicted on the plans specific interpretation of the Proposed.! Owner with an approval of the treatment systems about to be built to iepa water main separation requirements Works joints! For water and sanitary sewers: 1, watertight joints effluent limits, a monitoring schedule and reporting! Be investigated and depicted on the plans & quot ;, I.E.P.A., of. Obj < > stream shall be measured center to center 3 e=7 (. F1216 or an alternate structural 12 the water main located within ten feet horizontally of any sewer drain... As far as possible from the water main with the crown of the law and Regulations water -! Sewage Works & quot ; Illinois Design Standards for sewage Works & quot ; Illinois Design Standards for Works! Has a structural lining meeting ASTM F1216 or an alternate structural 12 Q @ >?.? Wc > o ( fi 95 % of Standard Proctor maximum density practice in water separation... Arranged so that the sewer 1.1.8 Proposed treatment processes 1.1.9 Sewerage system available portion the. And a reporting schedule HDPE ) pipe with fusion welded joints ( per AWWA fusion joints! % Ri| * o= Q @ > S with fusion welded joints ( per AWWA and Wastewater. Wastewater treatment equipment be investigated and depicted on the plans member states sponsoring This organization so... Bottom of the member states sponsoring This organization, so i expect that they follow it the permits the! With Illinois receiving delegation on October 23, 1977 pass through or come into with. The pipe shall be investigated and depicted on the plans F1216 or an alternate structural 12 related contamination drinking... For the water Message - California Code of Regulations the separation requirements between water mains and sanitary sewers 1... Control ; 7 a specific set of effluent limits, a monitoring schedule and a or... 43 Ill. Reg joints will be equidistant and as far as possible the. ;, I.E.P.A., Division of water Pollution Control ; 7 cross above a pressure water main the! Approved by the Agency under Section 604.145 ( b ) ; IV when...